Customer Challenge

The customer’s plastic zipper production line had been in operation for over 15 years, with most of the equipment being semi-automatic. It required a large number of workers, yet production capacity was limited to only 500–700 pcs/hour.


The Solution and Results

To overcome this bottleneck, the customer upgraded to our new plastic zipper production equipment. After the upgrade, production capacity increased to 1,500–2,000 pcs/hour, more than doubling the previous capacity.